![]() It takes one hour in real-time to fully charge a Power Storage unit that's empty, but it can take longer if the maximum amount of spare power doesn't satisfy the number of Power Storage devices connected to the grid. Each Power Storage unit can hold a maximum of 100 MW for one hour. Power Storage can be used to avoid power trips, and having multiple units to hold any excess power increases the efficiency of the grid. The Nuclear Power Plant uses Uranium Fuel Rods or Plutonium Fuel Rods, and its power production is 2,500 MW. Nuclear Power Plant (Tier 8): The resources required in Satisfactory for the Nuclear Power Plant are 250 Concrete, 25 Heavy Modular Frames, five Supercomputers, 100 Cables, and 100 Alclad Aluminum Sheets.This generator has a power production rate of 150 MW, and it uses Fuel, Liquid Biofuel, or Turbofuel. Fuel Generator (Tier 6): A Fuel Generator is built using five Computers, 10 Heavy Module Frames, 15 Motors, 50 Rubber, and 50 Quickwires.The energy output will be between 50 MW and 600 MW depending on the Geyser. Unlike other generators, the Geothermal Generator doesn’t use traditional types of fuel, but it needs to be built on top of a Geyser. Geothermal Generator (Caterium Research): Geothermal Generators can be built using eight Supercomputers, 16 Heavy Module Frames, 16 High-Speed Connectors, 40 Copper Sheets, and 80 Rubber.Coal, Compacted Coal, or Petroleum Coke plus Water are used to fuel a Coal Generator, and its production power is 75 MW. Coal Generator (Tier 3): To build Satisfactory's Coal Generator, 20 Reinforced Iron Plates, 10 Rotors, and 30 Cables are needed.It can use Leaves, Flower Petals, Wood, Mycelia, Biomass, Solid Biofuel, Packaged Liquid Biofuel, Alien Carapace, Alien Organs, or Fabric as fuel, and the maximum power production is 30 MW. Biomass Burner (Tier 0): The Biomass Burner requires 15 Iron Plates, 15 Iron Rods, and 25 Wires to build.
0 Comments
Leave a Reply. |